Vote: 3 - 0 Carried |
|
Other:
|
Commissioner Jack Stinnett (ABSENT)
|
|
Commissioner Richard Hawkinson (ABSENT)
|
|
|
|
|
|
|
|
|
|
2. |
|
|
PRESENTATION AND DISCUSSION REGARDING ONGOING COLLABORATIVE EFFORTS BETWEEN THE TOWN OF ORO VALLEY AND THE REGIONAL FLOOD CONTROL DISTRICT BY ERIC SHEPP, PE, DEPUTY DIRECTOR AND GREG SAXE, PhD, ENVIRONMENTAL PLANNING MANAGER
|
|
Pima County Flood Control District staff members Eric Shepp, Greg Saxe and Brian Jones provided a presentation that included the following:
- RFCD FY 2019-2020 Budget Overview, Floodplain Acquisition Program
- RCFD Floodplain Management Plan overview, public outreach phase, Community Survey
- Existing and proposed ALERT gauges in Oro Valley
- Pima County Office of Emergency Management, MyAlert system for broadcasting flood-safety information
- North Ranch Wash Floodplain Mapping Study, status
- Highland Wash and Carmack Wash Floodplain Mapping Studies,status |
|
|
|
|
|
|
|
|
3. |
|
|
DISCUSSION OF STORMWATER MEETINGS AND EVENTS
|
|
Senior Engineer Justin Turner reported on Stormwater meetings and events. |
|
|
|
|
|
|
|
|
4. |
|
|
REVIEW AND DISCUSSION OF STATUS OF ON-GOING FEMA-GRANT APPLICATIONS
|
|
Mr. Turner reported on two grant applications:
- on June 24, 2019 the Stormwater Utility was notified that the Catalina Ridge Channel Reconstruction grant
application did not meet HMA requirements. Our application was number ten on a list of which the top nine
are chosen. Stormwater Division Manager Mike Todnem stated that the application can be resubmitted
with corrections and possibly still be in the ranking of the top nine.
- on July 1, 2019 the grant application for the Lambert Lane Dip Crossing Reconstruction, Phase II was
awarded funding pending completion of an Application Briefing. |
|
|
|
|
|
|
|
|
5. |
|
|
DISCUSSION AND POSSIBLE ACTION REGARDING CANCELLATION OF THE AUGUST 15, 2019 SWUC MEETING
|
|
Discussion ensued regarding the cancellation of the August 15, 2019 Stormwater Utility Commission Meeting.
|